5.0out of 5 stars on Google Brisbane team · Monday to Friday

How landscapers win work from property developers

On a townhouse or estate project the landscaping is written into the council approval, so the landscaper a developer trusts is the one who can get it signed off and keep it alive until council takes it back.

Updated 27 October 2026

How it looks from their side

When a council approves a townhouse development or a subdivision, the approved plans usually include a landscape plan and the conditions spell out what has to be planted, where and at what size. Some conditions go further and say who has to certify the work and how long it has to be maintained, and the developer can't finish the project, release a bond or in some cases start using the building until that is done.

So from the developer's side landscaping is less about how the garden looks and more about closing out a condition. They want a landscaper who reads the approved plan and the conditions before quoting, builds to them, keeps records a landscape architect or council officer will accept, and is still around 12 or 24 months later when the maintenance period ends.

What they’ll ask you for

Reading the conditions before quoting

A Logan City Council approval for 12 townhouses required 100 litre trees at the rear of two units and at least one street tree every 15 metres, so a quote from the drawing alone would miss part of the job.

Records a landscape architect can certify

The same approval required a landscape architect to certify the work before the use started, after a 12 week establishment period, and again at the end of a 12 month maintenance period.

Street tree stock to council’s standard

An Inner West Council consent in Sydney required 200 litre stock complying with AS 2303, planted by someone with at least a Certificate III in horticulture or arboriculture.

A maintenance agreement that runs the full period

That consent asked for a 12 month maintenance agreement with a horticulturist or arborist, restarting from the date of any replacement tree, up to three times.

The right structural landscaping licence

Queensland needs a QBCC licence for structural landscaping over $3,300, NSW needs a contractor licence over $5,000, and Victoria needs Building and Plumbing Commission registration for domestic building work over $10,000.

Reports during the maintenance period

The City of Greater Geelong’s landscape standards ask for a signed maintenance checklist every three months and say defects council raises must be fixed within two weeks.

The work on offer

Approved landscape plan works

Building the gardens, turf, paths, edging and planting shown on the plan council approved. Priced from the plan and the conditions, either as a subcontract to the builder or as a separate package from the developer.

Street trees and verge works

Planting the street trees the conditions require, at the stock size and spacing council sets, with council inspections before and after planting. Usually quoted per tree including the maintenance period.

Maintenance or establishment period

Watering, weeding, mulching, replacing failed plants and reporting until council or a certifier signs off. Priced as a monthly or per-visit fee for the length of the period.

Structural landscaping

Retaining walls, paving not for vehicles, fences, decks, pergolas and drainage. Needs the right state licence above a set value and is usually bought through the builder.

Communal open space and entries

Shared gardens, play areas and estate entry statements that a body corporate or council will take over. Often bought directly by the developer near the end of the project.

The landscape plan is a condition, not a suggestion

Most councils approve a multi-unit development or subdivision against a set of plans that includes a landscape plan, and then add conditions that change or add to it. Those conditions are public, usually on the council's development application search, and they're the first thing to read before you price a developer's job. Three real examples show how much detail they can carry and how different councils are.

CouncilWhat the condition asked forHow long it is maintained
Logan City Council (12 townhouses)Two medium trees in 100 litre pots behind two units, street trees from the council's species list at one per 15 metres, and a landscape architect's certificate before the use startsA 12 week establishment period, then certification again after a 12 month maintenance period
Inner West Council, SydneyNamed street tree species in 200 litre stock, tree pits and soil vaults to council detail, and council inspection of the trees and pits before and after planting12 months from planting under an agreement with a horticulturist or arborist, restarting if a tree is replaced
City of Greater Geelong (subdivisions)Street trees in at least 45 litre containers and about 1.5 metres tall, generally one per lot, with hold point inspections during constructionGenerally 24 months after practical completion, with a bond held for the whole period

The practical lesson is that the plan drawing alone rarely tells you the job. Pot sizes, the species list, who must plant the trees, the inspections and the maintenance length all sit in the conditions or in a council standard the conditions refer to, and each changes your price. Ask the developer for the decision notice and the stamped plans when you're asked to quote, and if they don't have them to hand, you can usually find them yourself.

Street trees and verges belong to council

Work on the verge is work on council land, so council keeps control of it even though the developer is paying. Geelong's standards ask for seven working days' notice before planting so a council officer can inspect the marked-out locations, and the Inner West consent required inspections before and after planting. In Brisbane, street trees are protected under the Natural Assets Local Law, excavation inside a council tree's critical root zone needs a permit, and a new driveway needs at least two metres' clearance from an existing street tree. If you're laying paths or turf near existing trees, check those rules before you dig.

Replacements are where the money goes. Geelong says a replacement planted just before handover won't be accepted and will extend the maintenance period, and the Inner West consent restarts the 12 month clock from the date a tree is replaced. A dead street tree in month eleven can therefore cost the developer another year of maintenance, which is why they'll pay more for a landscaper who waters through summer and reports early.

Through the builder or straight from the developer

How the work reaches you changes who you answer to. If the landscaping is in the building contract, you're the builder's subcontractor, you work to their programme and site rules, and the builder claims your work in their progress payments. If the developer keeps landscaping out of the building contract, which is common for street trees, communal open space and the maintenance period, you deal with the development manager and often the landscape architect who has to certify your work.

Either way the licence follows the work, not the client. In Queensland, structural landscaping over $3,300 needs a QBCC licence, and the class covers retaining walls up to the height that doesn't need engineering certification under local law, as well as decks, fences, pergolas, paving not for vehicles and landscape drainage. In NSW a contractor licence is needed for structural landscaping over $5,000 including GST under a residential building contract, and unlicensed work carries fines of up to $22,000 for an individual. In Victoria, Consumer Affairs says practitioners must be registered with the Building and Plumbing Commission to do work worth more than $10,000, and the commission registers a domestic builder class limited to structural landscaping. If a job mixes planting with walls or decking, price the structural part separately so it's clear which licence applies.

Pricing the part that comes after practical completion

Councils hold bonds against the maintenance period, and they can be large. Wyndham City in Victoria calculates its outstanding works bond at 150% of the landscape cost, including 104 weeks of maintenance, and Geelong holds a maintenance bond covering 125% of the cost of reserve maintenance and tree establishment. A developer with that money held wants to know exactly what you'll do to get it back, so set out the visits, watering in dry months, replacements included, and the reports you'll send. Geelong's quarterly maintenance checklist is a good template for those reports even if your council doesn't ask for one.

Write the maintenance period as its own line with its own start date, because it usually begins at practical completion or council approval rather than when you finish planting. The property developers page covers finding developers and timing your approach, the landscapers page covers the other buyers worth writing to, and the council work guide is useful if you'd like to quote council's own parks and streetscapes too. If you'd rather not write to developers yourself, Curlew writes to development managers near you in your business name.

A first email you could send

An example only. The business is made up.

Mistakes that cost the work

Quoting from the landscape plan without reading the conditions

Pot sizes, street tree numbers and certification often sit only in the conditions, so the job costs more than you priced.

Leaving the maintenance period out of the quote

The developer can’t release the bond or close the condition without it, and a landscaper who disappears after planting rarely gets the next project.

Replacing dead trees just before handover

Some councils won’t accept it and restart or extend the maintenance period, which the developer will blame on you.

Building walls or decks over the licence threshold without the licence

It is unlicensed work under state law, and in NSW the fine for an individual can be up to $22,000.

Questions people ask

Where do I find a development’s landscape conditions?

On the council’s development application search, in the decision notice and the stamped plans. Ask the developer for them when you’re asked to quote.

How long is a landscape maintenance period?

It depends on the council and the approval. Examples include 12 months in a Logan townhouse approval and an Inner West consent, and generally 24 months in Geelong’s subdivision standards.

Do I need a licence to build retaining walls for a developer?

Usually above a value threshold: $3,300 in Queensland (QBCC), $5,000 in NSW (contractor licence) and $10,000 in Victoria (registration with the Building and Plumbing Commission).

Who pays for a street tree that dies during maintenance?

The developer is responsible to council, and they will usually pass it to the landscaper under the maintenance agreement, so agree in writing what replacements your price includes.

Want us to write to property developers for you?

$99 a month, including GST. No contract, stop any time.